010 036 2014-12-10 17.39.08 20140526_142055 DSC05969 DSC05971 DSC05977 DSC05983 DSC05986 DSC05999 DSC06013 IMG_0462 IMG_0584 SAM_1501 130923 Radscan 4_1 IMG_1106 IMG_1134 IMG_1200

ENEA Wytwarzanie in Białystok (formerly Elektrociepłownia Białystok) invested in Poland's first large-scale flue gas condensation plant, and Radscan eagerly welcomed the challenge to design, build and commission the system. The boiler is fired with biomass with capacity of ca. 80MW. 

Radscan delivery consisted of condensation and condensate purification with membrane technology. The plant was taken over in February 2015.